1) D.Tech Corporation Limited

G+8 Storied Residential Building of D.Tech Corporation Limited at Uttora Sector-7.

Construction Partner : SRD Limited


2) Washing Building Project of Epyllion Group

Client: Epyllion Group
Project Name: Washing Building Project

Four-storied RCC Building with internal drainage system, Utility Building, Water reservoir & Maintenance room.


3) Casting Plant Retrofitting of Nikki Thai Aluminium Int. Ltd.

Casting Plant Retrofitting Work. Retrofitting Member RCC Column, RCC Foundation.

Project Location: Sreepur, Mawna, Gazipur

 


4) Steel Shed Retrofitting of Active BD Ltd.

SRD Limited did this accessory factory’s DEA, retrofitting drawing, and construction work. The retrofitted items were the column, main beam,sub-beam, stair and bracing installation.


5) New WTP Project of Coca-Cola (Abdul Monem Ltd)

New WTP Project of Coca-Cola (Abdul Monem Ltd). It’s 50ft in Length, 25ft wide & 20ft in Height 22,500 Cubic Feet capacity Water Treatment Plant. Also used pile in the basement. All work is done by steel shutter. Construction work by SRD Limited.


6) CIP Tank Retrofitting Project of COCA-COLA (Abdul Monem Ltd.)

It’s a foundation retrofitting project of COCA-COLA (Abdul Monem Ltd.)

 


7) Infinia Dyeing & Knitting Mills Ltd.

Civil work of shed Construction at Infinia Dyeing & Knitting Mills Ltd. It’s an extension Project of Infinia Group.

Project Location: Kadamrasul, Sitakunda, Chottogram.

SRD Infinia Group Web

8) Knitting Building Project of Saiham Knit Composite Ltd.

Three Storied Knitting Building Project of Saiham Knit Composite Ltd. The area of the Building is 49,833Sft. Each Floor having 16,611 Sft (147 x113) & Floor height is 12ft, 17ft, 17ft. The construction work started on 18-10-2021 & the work is ongoing.

Project Location : Saihamnagar, Noyapara, Madhabpur, Sylhet.

Architectural Design, Structural Design & Construction Work by SRD LIMITED

 

SRD Saiham Knit Composite Ltd knitting Building

9) Dam Construction Project of Saiham Knit Composite Ltd.

Dam project of Saiham Knit Composite Ltd. The Length of the Dam is 362ft and the height is 8ft.

Design, drawing & Construction by SRD LIMITED.


10) Biological ETP Construction Project of Saiham Knit Composite Ltd.

Biological ETP Tank of Saiham Knit Composite Limited: It’s a 6750 Cubic Meter (271’ x 55’ x 16.5’) RCC ETP Construction work which works started on 10 January 2022 & work is in progress. Project location: Nayapara, Madhabpur, Habiganj, Bangladesh.

Design, drawing & Construction by SRD LIMITED.

SRD Saiham Knit Composite ETP

11) WTP Vertical Extension Project of COCA-COLA (Abdul Monem Ltd.)

A Construction of New WTP Extension Project of Coca-Cola Abdul Monem Ltd. at AML Beverage Unit, Comilla, Comilla, Bangladesh. Each Floor Area is 7000 sqft & Floor height is 26 ft. The Project Construction Started on 25 November 2021 and work is ongoing.

Construction work by SRD LIMITED

SRD COCC-COLA WTP
SRD COCC-COLA WTP
SRD COCC-COLA WTP
SRD COCC-COLA WTP
SRD COCC-COLA WTP
SRD COCC-COLA WTP

12) Printing Building Project of Saiham Knit Composite Ltd.

Project Name: Printing Building Project
Client: Saiham Knit Composite Ltd.

Two-storied RCC printing building.

Floor area -7680 sft.

Total Floor area – 15,360 sft.

SRD Saiham Printing Building
SRD Saiham Printing Building
SRD Saiham Printing Building
SRD Saiham Printing Building
SRD Saiham Printing Building