1) Furnace Shed of Nikki Tahi Aluminum Int. Ltd.

Proposed New Furnace Steel shed of Nikki Tahi Aluminum Int. Ltd.

Construction Work by : SRD Limited

Project Location: Sreepur, Mawna, Gazipur

SRD Nikki Furnace Shed (1)
SRD Nikki Furnace Shed (5)

2) Casting Plant Retrofitting of Nikki Thai Aluminium Int. Ltd.

Casting Plant Retrofitting Work. Retrofitting Member RCC Column, RCC Foundation.

Project Location: Sreepur, Mawna, Gazipur

 


3) Yarn Dyeing Warehouse Project of Saiham Knit Composite Ltd.

Client: Saiham Knit Composite Ltd.
Project Name: Yarn Dyeing Warehouse Project
It is a single-story, 58-foot-high, 16,000-sft Prefabricated Steel Structure warehouse.

Architectural Design, Structural Design, and Construction Work by SRD LIMITED.
Project Location: Nayapara, Madhabpur, Habiganj, Bangladesh


4) Prefabricated Steel Bridge Project of Saiham Knit Composite Ltd.

Prefabricated Steel Bridge Project of Saiham Knit Composite Ltd. The length of the bridge is 40ft and the width is 16ft. The bridge has been constructed to develop factory internal communication and easy materials shifting.

Chemical Building Store Project at Saiham Knit Composite Ltd
SRD Saiham Knit Composite Bridge
SRD Saiham Knit Composite Bridge
SRD Saiham Knit Composite Bridge
SRD Saiham Knit Composite Bridge
SRD Saiham Knit Composite Bridge

5) Car Parking Project Of Saiham Knit Composite Ltd.

Project Name: Car Parking
Client: Saiham Knit Composite Ltd.

Architectural Design, Structural Design & Construction work by SRD LIMITED

SRD CAR Parling Saiham Knit
SRD CAR Parling Saiham Knit
SRD CAR Parling Saiham Knit