Chemical ETP tank of Niagara Textile Limited: It’s a 1,450 Cubic Meter RCC ETP Construction Wor which works started in April 2019 & successfully completed within December 2019. The work was maintained with proper ratio, slum, and clear cover as per drawing.
Project Location: Chandra Circle, Kaliakair, Gazipur, Bangladesh

Design, Drawing & Construction by SRD Limited.