G+6 Storied RCC Building Retrofitting & Vertical Extension Project Of Pride Group

G+6 Retrofitting Work at Building 2: We started our retrofitting project at Building 2 on 23 October 2018 and handed it over on 09 June 2020. It’s a 5-storied building. In this building, we did Foundation Retrofitting, Grade Beam Retrofitting, Column Retrofitting, and Beam Retrofitting. Each floor area was 22,000 sft. We did all the work on running the floor with proper safety. This was an RSC (ACCORD) Based Project for which we successfully got approval.

Project Location: Ulail, Savar, Dhaka, Bangladesh